HomeHelp and adviceHome improvements

Connecting to a sewer

外国加速器下载地址-猴王加速器

If you're planning to connect or reconnect to one of our sewers, you’ll need our consent before you go ahead. That’s because we need to check the connection will work as planned and that it won’t potentially cause problems such as sewer flooding or pollution. We have legal duties around this, set out in Section 94 of the Water Industry Act 1991 (‘the Act’).

Sewer connections can be made directly to a public sewer or indirectly to a private drain that in turn discharges to a public sewer. Whether your connection is direct, indirect, or if you're seeking to relocate an existing manhole, an application form must be completed.

You can either connect to a local sewer under Section 106 of the Act or in some circumstances to a trunk or chemical sewer under Section 107 of the Act. Connecting to trunk or chemical sewer can be complex and dangerous so we'll need to carry out this work for you.

If your proposals are covered by a planning application, no right of connection to a public sewer exists under the Water Industry Act 1991 until planning approval has been granted and any drainage conditions discharged. We'll therefore be unable to approve a sewer connection application made before planning is granted.

外国加速器下载地址-猴王加速器

外国加速器下载地址-猴王加速器

佛跳墙更名极光v2.7.14,佛跳墙更名为极光后闪退,佛跳墙改名极光下载链接,佛跳墙升级极光  疾风加速器,黑洞加速器官网下载分享二维码,天行vapn,黑洞加速器官网下载安装  灯塔vp加速器,加速器黑洞,优途加速器,香蕉加速器vp  shadowrocket加速器,永久不收费的加速器,极狐加速器,佛跳墙电脑版下载  坚果加速器ios下载,坚果加速器vnp,坚果加速器vpm,坚果加速器vn  花猫云安卓下载,花猫云跑路了,花猫云打不开,花猫云2024年  大象加速器,大象vp加速器,大象加速器官网,